Friday, March 25, 2016

Week 9 is done

I wasn't out at the house much this week. I did stop by today and get a few pics and talk to our Project Manager. He said they should finish the siding and drywall this weekend.  They got the meter on so they've got the furnace running.  The ceilings were finished as well.  Plan is to do the first coat of paint Monday and flooring Tuesday, Wednesday and Thursday. Trim is set to start Friday but he's thinking he may get bumped to the next Monday.


Front
Side
Left side.  Definitely in need of grading.  Probably will call for some sort of retaining wall around the landscaping.
Back (home of future deck.)
Right side of back yard.  It goes back a bit, but I'm excited we have some big trees!

A few things that I'm watching:
Electrical outlet in garage still hasn't been exposed.  (PM said Monday they would expose it.)
Basement bathroom rough-in still hasn't been exposed. (PM was made aware at preconstruction meeting.)
Windows still don't close all the way.  (I told PM at preconstruction meeting and he said they would address it before the final walk through.)
Two windows need fixed.  One is chipped and one has a trim piece missing.
The boys bathtub has some scratches. 

Bathtub scratched
Another bathtub scratch
Picture from last week and probably the cause of said scratches :(
You can sort of see that top half of window is missing some trim.
Cracked "ledge"

Also, scheduled our POD to be redelivered on May 14.  So with an April 28 closing, that means Andrew has 2 weekends to build the island and remove and re-do the half wall :D